YENİKÖY THERMAL POWER PLANT UNIT 1 CONDENSER EDDY CURRENT AND CLEANING WORKS
Scope of Work:
- Cleaning of 19,616 condenser tubes using a 1000 bar water jet.
- Conducting Eddy Current Testing and preparing detailed reports.
- Blinding of damaged tubes.
Client: YK ENERJİ A.Ş.
Year: 2020
Tube Material: CuZn20Al2
- Specifications: Diameter: 30 mm, Thickness: 1 mm, Length: 9000 mm