Establishment of PLT-7 Off Gas Recovery Unit Facility at Tüpraş İzmir Refinery
Client: TÜPRAŞ A.Ş.
Year: 2015
Construction Scope:
- Installation of 54 bored piles with a diameter of 800 mm.
- Construction of 400 m² foundation and 21 equipment foundations.
Mechanical Scope:
- 15,000 meters of piping.
- Installation of 150,000 kg of equipment.
- Setup of Off Gas Compressor.
- PWHT (Post Weld Heat Treatment) and insulation work.
Electrical-Instrumentation Scope:
- Instrumentation connections for the entire system.
- Electrical installation and commissioning.