KEMERKÖY THERMAL POWER PLANT UNIT 2 CONDENSER EDDY CURRENT, CLEANING, AND RE-TUBING WORKS

Scope of Work:

  • Cleaning of 19,616 tubes in Condenser No. 2 using a water jet at 1000 bar.
  • Conducting Eddy Current Testing and preparing detailed reports.
  • Removal of 1,616 tubes using a Tube Puller machine.
  • Installation of new tubes and securing them with a torque-controlled fin-tube machine.
  • Atmospheric pressure testing of the condenser.

Client: YK ENERJİ A.Ş.
Year: 2021
Tube Material: CuZn20Al2

  • Specifications: Diameter: 30 mm, Thickness: 1 mm, Length: 9,000 mm