KEMERKÖY THERMAL POWER PLANT CONDENSER MAINTENANCE

Cleaning the 19.616 Tube of the No.1 Condenser with Water Jet (1000 Bar) – Eddcy Current Test and Reporting Removal of 1616 tubes by Tube Puller Machine Mounting the dismantled tubes to their places and fixing them with Torque controlled Machine Testing the Condenser at Atmospheric Pressure

  • Customer : YK ENERJİ A.Ş.
  • Year: 2020
  • Pipe Material  : CuZn20Al2 ( Çap: 30 mm X 1 mm Boy : 9000 mm)